The Royal Atlantis Resorts & Residences - Palm Jumeirah

Detailing, modeling, fabrication, painting & supply of structural steel frames for various type of swimming pools (approx. 270 Ton).
Client: Absolute-Pools
Consultant: Dec-DYNAMIC
Main Contract: SSANGYONG / BESIX
Location: Dubai

Masdar Institute Neighbourhood

Design, detailing, modeling, fabrication, painting and installation of plaza bridges steel structures (approx. 120 Ton).
Client: Masdar City
Consultant: AECOM
Main Contract: Six Construct
Location: Abu Dhabi

AL Rahmania Shopping Mall

Design, detailing, modeling, fabrication and installation of GRC supports and steel brackets.
Client: Sharjah co-operative society
Consultant: OHC Architects & Engineering
Main Contract: OMIS contracting
Location: Sharjah

Qushwira Field Developement Phase - 2

Design, detailing, modeling, fabrication and supply of precast sleeper RCC-steel shutter & secondary steel works (approx. 180 Ton).
Client: ADNOC
Main Contract: Petrofac / china state construction LLC, Abu Dhabi

Masdar Institute Neighbourhood

Design, detailing, modeling, fabrication, painting and installation of sky light frames, roof crossovers, roof purlins, staircases and cage ladder (approx. 170 Ton).
Client: Masdar City
Consultant: AECOM
Main Contract: Six Construct
Location: Abu Dhabi

Al-Maryah Central

Design, detailing, modeling, fabrication and installation of Shed (approx. 1800 Sq.m).
Consultant: AECOM
Main Contract: MULTIPLEX

Masdar Institute Neighbourhood

Design, detailing, modeling, fabrication, painting and installation of architectural landscape handrails and undercroft handrails (approx. 1200 L.Mtr).
Client: Masdar City
Consultant: AECOM
Main Contract: Six Construct
Location: Abu Dhabi

132/33/11kv Substation Works

Fabrication and supply of secondary steel works (approx. 120 Ton).
Client: FEWA
Main Contract: MITSUBISHI ELECTRIC
Location: North Emirates

Jabel Ali Power Station

Fabrication and supply of Precast angle supports (approx. 60 Ton).
Client: DEWA
Consultant: Mott Mac-Donald
Main Contract: Almah Metalic Industries LLC.

Bounce

Fabrication and supply of trampoline for Bounce
(approx. 120 Ton).
Client: Bounce-Inc

Masdar Institute Neighbourhood

Design, detailing, modeling, fabrication and installation of shade structure (approx. 150 Ton).
Client: Masdar City
Consultant: AECOM
Main Contract: Six Construct
Location: Abu Dhabi

Altec Alusalt Structures

Design, detailing, modeling, fabrication and installation of salt gantry structures and platforms (approx. 180 Ton).
Client: Altex
Consultant: Marad Eng. Design
Main Contract: Bronze Star Steel building

Talex

Fabrication, painting & installation of skylight support, maintenance walkways, steel bridges, platforms, staircases, tanks and handrails (approx. 150 Ton).
Client: Talex

Mirkaz Mall

Design, detailing, modeling, fabrication and installation of roof shed and chequered plate work.
Client: Ajman Holding
Consultant: AL Safia Engineering Consultants
Main Contract: China state construction middle east.

Sharjah Turkish Masjid

Design, detailing, modeling, fabrication and installation of Canopy steel structure (approx. 220 Ton).
Client: Govt Of Sharjah
Consultant: Arab & turk international
Main Contract: Darwish Engineering Emirates

The Royal Atlantis Resorts & Residences

Design, detailing, modeling, fabrication and installation of secondary steel works
Client: STc Oman LLC
Consultant: Dec-DYNAMIC
Main Contract: Ssangyong - Besix
Location: Palm Jumeirah, Dubai

Warner bros. Theme park

Design, detailing, modeling, fabrication, painting & installation of skylight structures, maintenance platforms, steel bridges, loading platforms. steel bridges, loading platforms, staircase, crossovers, facade structures, and handrails (approx. 150 Ton).
Client: Miral
Consultant: AECOM
Main Contract: Six Construct

Lamp Post

Fabrication and supply of steel post various type and various type of steel structures (approx. 60 Ton).
Client: Allico industries Company Limited
Consultant: Al One(z) Group
Main Contract: Allico industries Company Limited

Construction of 1100 Housings Units Including Roads, Infrastructure and Landscape

Fabrication and installation of vanity steel frame (approx. 100 Ton).
Client: UAE Ministry of Presidential Affairs
Consultant: AECOM
Main Contract: Arabtec construction LLC.

Hatta Hospital

Design, detailing, modeling, fabrication, painting & installation of canopy steel structures steel platforms and helipad (approx. 50 Ton).
Client: Hatta Hospital
Consultant: G3 Engineering consultant
Main Contract: CATOBO / KINGSTON

Truck Unloading Station

Fabrication and supply of truck chutes unloading system (approx.85 Ton).
Client: Inter Cem
Main Contract: AL Nawras steel co. LLC

Proposed G+6Typ Roof Residential development. Al Quasis

Fabrication, supply and installation of hanging platform and chequered plate (approx. 85 Ton)
Client: WASL
Consultant: Schuster Pechtold
Main Contract: Airo Link Building Contracting LLC
Location: Al Quasis

Formwork Supplier

Fabrication, painting, supply of various types of formwork support and products (approx. 70t)
Main Contract: Fly Forms International L.L.C

Masdar Institute Neighbourhood

FDesign, detailing, modeling, fabrication, painting and installation of GRC support brackets (approx. 120 Ton).
Client: Masdar City
Consultant: AECOM
Main Contract: Six Construct
Location: Abu Dhabi

Formwork Supplier

Fabrication, painting, supply of various types of formwork support and products (approx. 800t).
Client: Uptrend
Main Contract: Doka

Zayed national museum

Connection Design, Detailing , GA Drawings , Shop Drawings, Erection Drawing, Fabrication , Supply And Installation of Steel Structure ( Approx : 1200 Ton)
Client:Department of culture and tourism
Consultant: WSP
Main Contract: Sixco - Trojan
Location: Abu Dhabi

Guggenheim Abu Dhabi

Connection Design, Detailing , GA Drawings , Shop Drawings, Erection Drawing, Fabrication , Supply And Installation of Secondary Steel Structure ( Approx : 200 Ton)
Client:Department of culture and tourism
Consultant: WSP
Main Contract: Sixco - Trojan
Location: Abu Dhabi

Uptown Dubai Phase 1

Detailing , GA Drawings , Shop Drawings, Erection Drawing, Fabrication, Supply And Installation of Secondary Steel Structure ( Approx : 950 Ton)
ClientDubai multi commodities centre
Consultant: WSP
Main Contract: Sixcostruct
Location: Dubai

468 Dubai

Detailing , GA Drawings , Shop Drawings, Erection Drawing, Fabrication , Supply And Installation of Secondary Steel Structure ( Approx : 200 Ton)
Client:Havelock One Interiors LLC
Consultant: Setter Archiects
Main Contract: Havelock
Location: Dubai